Industrial & Commercial Developments

Sonipat Global Industrial Township

A Future-Ready Industrial Investment Destination

A meticulously planned Integrated Industrial Township, envisioned to address the evolving demands of modern industry while delivering sustained value for long-term investors. Designed with a well-structured zoning framework, this township offers a balanced ecosystem of strategically located industrial plots, wide internal road networks, and thoughtfully developed green infrastructure, ensuring operational efficiency, sustainability, and future scalability.

Strategically positioned on NH-352A towards Gohana Sonipat by pass, the project enjoys excellent highway connectivity with seamless and easy access to SGIT, enabling smooth movement of goods, workforce, and logistics. Purpose-built for manufacturing, warehousing, and logistics, the township stands out as a high-potential industrial hub, offering businesses and investors a compelling opportunity backed by strong infrastructure, connectivity advantage, operational stability, and long-term capital appreciation.

Read More

Project Image
Prime Location
Robust Infrastructure
Strategic Connectivity

Project Area:

300 Acres

FUTURE GROWTH, SEAMLESSLY ENGINEERED

FREQUENTLY ASKED QUESTIONS

The project features a well-planned internal road network for smooth industrial movement and long-term reliability. SGIT’s industrial plots are designed for optimal frontage, easy access, and flexible planning-ensuring efficient land use, seamless logistics, and compliance-ready development. Built with a long-term vision, the township offers organized zoning, robust infrastructure, scalable growth, and an environment-conscious approach.

How easy is it to reach SGIT?

SGIT enjoys excellent road connectivity as it is strategically located on NH-352A, very close to the flyover. The project offers smooth and hassle-free access to the National Highway network, ensuring easy and time-efficient commuting for employees, logistics, and commercial movement.

Is the project government-approved?

Yes, the project is approved by the relevant statutory authorities such as DTCP & RERA or other competent state authorities (as applicable).

Is CLU Required?

No, SGIT already has an Industrial Township License - NO CLU Required.

Is the project RERA registered?

Yes, the project is registered under HRERA. RERA registration details are available upon request or can be checked on the official RERA portal.

What type of industries are permitted?

Permissible industries depend on zoning norms and pollution category (Green/Orange/Red).

Can the plot be used for warehousing or logistics?

Yes, subject to zoning regulations and approval from the concerned authority.

What is the minimum construction timeline?

Typically, construction must commence within 12–36 months from possession, as per allotment terms and authority guidelines.

What happens if construction is delayed?

Penalty, extension charges, or cancellation may apply as per the allotment agreement and authority norms.

What is the maximum FAR/FSI allowed?

1.5 FAR. Detailed building bylaws will be provided before construction.

What is the maximum building height allowed?

Maximum heights 30 meters permissible, moreover it depends on plot size, road width, fire norms, and authority regulations.

LOCATION ADVANTAGES

  • Purpose-Built Infrastructure for Industrial Operations 
  • Ready-to-Use, Future-Ready Industrial Plots
  • Green & Sustainable Development 
  • Efficient & Integrated Utilities
  • Investor-Friendly Development Model 
  • Strong Workforce Accessibility 
  • High-Growth Industrial Corridor Advantage

ENQUIRE NOW