Sonipat Global Industrial Township
A Future-Ready Industrial Investment Destination
A meticulously planned Integrated Industrial Township, envisioned to address the evolving demands of modern industry while delivering sustained value for long-term investors. Designed with a well-structured zoning framework, this township offers a balanced ecosystem of strategically located industrial plots, wide internal road networks, and thoughtfully developed green infrastructure, ensuring operational efficiency, sustainability, and future scalability.
Strategically positioned on NH-352A towards Gohana Sonipat by pass, the project enjoys excellent highway connectivity with seamless and easy access to SGIT, enabling smooth movement of goods, workforce, and logistics. Purpose-built for manufacturing, warehousing, and logistics, the township stands out as a high-potential industrial hub, offering businesses and investors a compelling opportunity backed by strong infrastructure, connectivity advantage, operational stability, and long-term capital appreciation.
Read More
Prime Location
Robust Infrastructure
Strategic Connectivity
Project Area:
FUTURE GROWTH, SEAMLESSLY ENGINEERED
FREQUENTLY ASKED QUESTIONS
The project features a well-planned internal road network for smooth industrial movement and long-term reliability. SGIT’s industrial plots are designed for optimal frontage, easy access, and flexible planning-ensuring efficient land use, seamless logistics, and compliance-ready development. Built with a long-term vision, the township offers organized zoning, robust infrastructure, scalable growth, and an environment-conscious approach.
SGIT enjoys excellent road connectivity as it is strategically located on NH-352A, very close to the flyover. The project offers smooth and hassle-free access to the National Highway network, ensuring easy and time-efficient commuting for employees, logistics, and commercial movement.
Yes, the project is approved by the relevant statutory authorities such as DTCP & RERA or other competent state authorities (as applicable).
No, SGIT already has an Industrial Township License - NO CLU Required.
Yes, the project is registered under HRERA. RERA registration details are available upon request or can be checked on the official RERA portal.
Permissible industries depend on zoning norms and pollution category (Green/Orange/Red).
Yes, subject to zoning regulations and approval from the concerned authority.
Typically, construction must commence within 12–36 months from possession, as per allotment terms and authority guidelines.
Penalty, extension charges, or cancellation may apply as per the allotment agreement and authority norms.
1.5 FAR. Detailed building bylaws will be provided before construction.
Maximum heights 30 meters permissible, moreover it depends on plot size, road width, fire norms, and authority regulations.
LOCATION ADVANTAGES
- Purpose-Built Infrastructure for Industrial Operations
- Ready-to-Use, Future-Ready Industrial Plots
- Green & Sustainable Development
- Efficient & Integrated Utilities
- Investor-Friendly Development Model
- Strong Workforce Accessibility
- High-Growth Industrial Corridor Advantage
ENQUIRE NOW